A permit is required before carrying out works on or near the Adelaide Metropolitan Passenger Rail Network (AMPRN). Works occurring outside of the Rail Corridor that have the potential to impact the AMPRN will also require a permit. Apply here for Rail Network Access (excluding Tram)

Allow 21 days for a permit to be obtained. If you need to discuss the application or requirements, please phone the Network Access on 0466 453 116.

Before completing the application form below, please ensure you have read the ‘Accessing the Adelaide Metropolitan Passenger Rail Network Procedure’.

To initiate application, complete the form and email it to KDA-networkaccess@keolisdowner.com

Accessing the Adelaide Metropolitan Passenger Rail Network Procedure’ (NA-OSP-PR-00054)
AMPRN Application Form (NA-OSP-FO-00052)

Minimum Submission Times

The following submission times must be adhered to for all network access applications:

 

TYPE OF WORKREQUIRED ACCESS APPLICATION SUBMISSION TIMEAPPROVAL LEVEL REQURIED
Closure of a line(s) requiring the cancellation of revenue services on a business day.Typically 6 months (26 weeks)Minister for Transport and Infrastructure
Closure of a line requiring the cancellation of revenue services on a weekend or public holiday4 months (16 weeks)Minister for Transport and Infrastructure
An extended ALBF requiring the cancellation of the first and/or last service(s).21 daysDeputy Rail Commissioner
An extended ALBF requiring the cancellation of Fall Ins/Fall Outs.21 daysService Delivery Director or Delegate
Work requiring amendment of Platform Occupation Diagrams.21 daysService Planning and Operational Performance Manager
Work requiring revenue services to operate around the worksite either by bi-directional working or using alternative track.8 weeksService Planning and Operational Performance Manager
All other works21 daysTeam Leader Network Access

* Major events will be taken into consideration when reviewing all network access applications*

Electrical Safety

The following railway lines are electrified with a 25kV AC overhead wire:

  • Seaford railway line

  • Flinders railway line

  • Gawler railway line (WIP)

  • Belair railway line between Adelaide and Goodwood

Warning: No DIT underground services are shown on Dial Before You Dig.

Special safety conditions apply when working in these areas.

These electrical safety requirements detail the conditions which must be met by an external party or contractor working on or near:

  • Overhead Traction Wiring Equipment, in or about Adelaide Metropolitan Train Network.

  • Electrical low voltage services within facilities and corridors controlled by KDA including signalling equipment.

PR-EM-EE-112 25kV Electrical Safety Instructions - Train

Fees & Charges

Fees will be charged for protection officers in accordance with the supply contractors.

If work is to be carried out in the electrical section of the network that requires an overhead isolation or if a track inspection is required, a fee will be incurred by the applicant for the work to be carried out.